Shower Tile Installation Services in Orlando, Florida
Shower tile installation is one of the most visible upgrades in any bathroom remodel, and at Renovating Central Florida LLC, we understand that proper installation requires precision, waterproofing expertise, and attention to detail. Whether you live in Avalon Park, Winter Park, or along the Winter Springs corridor, our team handles substrate preparation, cement board installation, waterproofing membranes, and tile placement using industry-standard thin-set mortar and grout techniques. We've completed hundreds of shower tile installations across Central Florida, from modest 30-square-foot shower enclosures to luxury spa-style installations with heated floors and accent lighting.
Our shower tile installation process begins with a detailed site inspection and moisture assessment of your existing bathroom. We remove old tile and debris, repair any water damage or structural issues, apply waterproofing membranes to all surfaces, install cement board backing, lay out your tile design, set each tile with precision-mixed mortar, allow proper curing time (typically 24-48 hours), and finish with professional grout application and sealing. From neighborhoods like Hunters Creek and Meadow Woods to communities near Cocoa and Melbourne, homeowners trust our team to deliver tile installations that prevent leaks, resist mold, and maintain beauty for 15+ years.
What Is Included
When you hire Renovating central Florida LLC for shower tile installation, here is exactly what you get:
- Complete removal and disposal of existing tile and debris
- Substrate evaluation and water damage repair if needed
- Cement board or Durock installation with proper fastening
- Waterproofing membrane application to all shower surfaces
- Tile layout planning and marking for symmetrical installation
- Professional thin-set mortar application and tile setting
- Grout application, cleaning, and sealing within 48-72 hours
Signs You Need Shower Tile Installation
- Water stains or discoloration appearing on walls below tile
- Soft spots in drywall or framing adjacent to shower
- Mold or mildew growth within grout lines or behind tile
- Loose or cracked tiles that shift when pressed
- Crumbling or deteriorating grout in existing installation
- Water pooling on shower floor instead of draining properly
- Musty odors coming from walls or under the shower pan
- Efflorescence (white mineral deposits) on grout or tile surface
Our Shower Tile Installation Process
Inspection and Planning (30 minutes - 1 hour)
Our team visits your home in Orlando, Oviedo, or your Central Florida location to assess the existing shower space, check for moisture damage, confirm tile selection and layout preferences, and provide a detailed written estimate. We photograph the space and discuss waterproofing options suitable for Florida humidity.
Demo and Substrate Prep (4-8 hours)
We remove old tile, grout, and any damaged backing material. We repair water-damaged studs or drywall, level the substrate, and ensure proper slope toward the drain. This step takes 1 day for most standard shower installations in homes throughout Clermont, Kissimmee, and Lake Mary.
Waterproofing and Cement Board Installation (6-12 hours)
We install 1/2-inch cement board or Durock using corrosion-resistant fasteners, then apply liquid or sheet waterproofing membranes per ANSI standards. This critical step prevents water intrusion and mold in your shower walls. Most homes complete this stage within 1 day.
Tile Layout and Setting (8-16 hours)
We mark layout lines, mix thin-set mortar to proper consistency, apply mortar using notched trowels, and set each tile with spacers for uniform grout lines. We check level and plumb continuously and use premium materials like Schluter or Kerdi-Board systems for added protection.
Grouting and Sealing (4-6 hours plus 48-hour cure)
After mortar cures 24 hours, we apply grout (epoxy or urethane for maximum durability), clean excess grout, and allow 48-72 hours full cure before sealing. We apply grout and tile sealers appropriate for your material choice and the humid Central Florida climate.
Final Inspection and Handoff (1-2 hours)
We perform a complete walkthrough, test drainage, verify all joints are sealed, touch up any imperfections, and provide maintenance instructions. We leave you with care guidelines and warranty documentation for your new shower tile system.
Types of Shower Tile Installation We Handle
- Porcelain tile shower installation - durable, water-resistant, suits modern and traditional designs
- Ceramic tile shower installation - affordable, decorative, ideal for accent walls and smaller projects
- Natural stone tile (marble, granite, slate) - luxurious, unique textures, requires regular sealing
- Glass tile shower installation - contemporary look, easy to clean, often used for feature walls
- Subway tile installation - classic 3x6 or 4x8 format, works in traditional or modern bathrooms
- Mosaic or mixed-material tile - artistic custom designs, accent borders, decorative details
- Large-format tile (12x24 or larger) - fewer grout lines, modern appearance, requires expert installation



